TechnoSports Media Group
  • Home
  • Technology
  • Smartphones
  • Deal
  • Sports
  • Reviews
  • Gaming
  • Entertainment
No Result
View All Result
  • Home
  • Technology
  • Smartphones
  • Deal
  • Sports
  • Reviews
  • Gaming
  • Entertainment
No Result
View All Result
TechnoSports Media Group
No Result
View All Result

Intel pushes Meteor Lake Release to end of 2023 and Pat Gelsinger planning his 3rd visit to TSMC

Nivedita Bangari by Nivedita Bangari
July 10, 2022
in News, Technology
0

The release of Intel’s 14th Gen Meteor Lake processors has been postponed until the very end of 2023, according to a DigiTimes story (via @chiakokhua). Using the Intel 4 process, which was supposed to start mass production in late 2022, is potentially in peril.

These chips were created to take advantage of a chiplet or tiled architecture that was fabricated on various process nodes, notably the iGPU tile on TSMC’s 3nm N3 process node. To address this issue, Intel CEO Pat Gelsinger will make his third trip to Taiwan in August to meet with TSMC representatives and discuss revised foundry capacity plans.

RelatedPosts

Why You Shouldn’t Buy Affordable Flagships Right Now

73 Phones Worth ₹24 Lakh Stolen at Enrique Iglesias Concert

UIDAI’s e-Aadhaar App Coming by December 2025: Update Details from Home

If the 14th Gen Intel Meteor Lake processors are delayed, Skylake will return. The difference this time is that AMD has competitive goods at every price range and isn’t falling behind. A postponed debut would significantly harm Intel’s reputation with consumers and give AMD a significant market share once more.

Industry insiders claim that if Meteor Lake is delayed, Intel will suffer greatly.

DigiTimes report on 2022.07.08:

"Intel CEO visiting Taiwan in August to discuss 3nm orders with TSMC" pic.twitter.com/QBaa2Kf3gA

— RetiredEngineer® (@chiakokhua) July 8, 2022

An outsourcing contract between Intel and TSMC had already been signed, making Intel a “heavenly king” customer. There were earlier reports that TSMC would turn what was originally intended as an R&D centre and mini-line (P8—P9) at Baoshan Fab2 gigafab expansion phase into a second 3nm manufacturing site after verifying receipt of Intel’s sizable order and in an effort to distance itself from Apple. According to the contract, TSMC should have been able to produce the 3nm GPU tile on time.

Intel
FILE PHOTO: The logo of Taiwan Semiconductor Manufacturing Co (TSMC) is pictured at its headquarters, in Hsinchu, Taiwan, Jan. 19, 2021. REUTERS/Ann Wang

However, if Intel wishes TSMC to additionally postpone production because Intel’s own Intel 4 computing tile is not ready for production due to “market conditions” and process technical issues, Intel will be responsible for all losses.

Earlier, there had been a number of reports suggesting that Intel would obtain 3nm wafer capacity with Apple as one of the first customers. According to reports, TSMC has set up a separate supply line to make sure the chip giant has a steady supply of chips. Both TSMC and Intel would suffer significant losses from a postponed Meteor Lake launch, and neither will be able to do much about it until a backup outsourcing strategy is already in place.

Also Read:

AMD Ryzen Threadripper Pro 5000WX-Series Packages Images appear Online

source

Tags: IntelPat GelsingerTSMC
Previous Post

Starlink Maritime: SpaceX offers fastest internet Connectivity in Seas at US$5000

Next Post

Virgin River (Season 4): The new trailer depicts trouble arising in the relationship between Melinda and Jack 

Related Posts

News

Why You Shouldn’t Buy Affordable Flagships Right Now

November 3, 2025
News

73 Phones Worth ₹24 Lakh Stolen at Enrique Iglesias Concert

November 3, 2025
Technology

UIDAI’s e-Aadhaar App Coming by December 2025: Update Details from Home

November 3, 2025
Technology

YouTube Premium High-Quality Audio: Is It Worth the Upgrade?

November 3, 2025
Technology

NPCI Launches UPI Help: Manage All Payments from One App

November 3, 2025
FAQ

The BEST Google Play Redeem Codes as of November 2025

November 3, 2025
Next Post
via-https://www.netflix.com/tudum/articles/watch-virgin-river-season-4-trailer

Virgin River (Season 4): The new trailer depicts trouble arising in the relationship between Melinda and Jack 

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

  • Buy JNews
  • Support Forum
  • Pre-sale Question
  • Contact Us
Call us: +1 234 JEG THEME
No Result
View All Result
  • Home
  • Technology
  • Smartphones
  • Deal
  • Sports
  • Reviews
  • Gaming
  • Entertainment

© 2025 TechnoSports Media Group - The Ultimate News Destination