Intel 18A process node is witnessing massive industry optimism, with Microsoft reportedly joining as a major customer. The cutting-edge process entered risk production in April 2025 and remains on track for volume manufacturing later this year, marking a critical milestone in Intel’s ambitious comeback.
Table of Contents

Intel 18A: Key Specifications
Specification | Details |
---|---|
Node Class | 1.8nm (sub-2nm) |
Key Technologies | RibbonFET (GAA), PowerVia backside power delivery |
Performance Gain | 25% faster vs Intel 3 (or 36% lower power) |
Density Improvement | 28-30% better than Intel 3 |
Current Status | Risk production (April 2025) |
Volume Production | Late 2025 |
First Products | Panther Lake CPUs, Clearwater Forest Xeons |
Microsoft Joins as Major Customer
According to industry reports, Microsoft is shaping up as a crucial 18A customer for its upcoming Maia 2 AI accelerators, with sampling ongoing since the previous CEO’s era. This represents a significant vote of confidence from Big Tech in Intel’s foundry ambitions.
Recent analysis shows 18A yield rates have improved to 55%, surpassing Samsung’s 2nm SF2 process at 40%, though still trailing TSMC’s N2 at 65%. KeyBanc projects yields reaching 70% by Q4 2025, sufficient for mass production of Panther Lake mobile CPUs.

Revolutionary Technologies: RibbonFET & PowerVia
RibbonFET represents Intel’s first new transistor architecture since FinFET in 2011, using gate-all-around design to boost density and efficiency. PowerVia is the industry’s first mass-production backside power delivery network, separating power and signal lines to improve performance.
Together, these innovations deliver 25% performance boost at the same voltage or 36% power reduction at identical clocks. The Intel 18A platform also offers an 18A-P high-performance variant providing 8% better performance per watt.

External Adoption Remains Critical
While internal products like Panther Lake validate the technology, Intel is betting on the 14A node to gain broader market attention, making external customer adoption crucial for foundry success. The company has already invested over $90 billion in its foundry initiative.
With defect density already below 0.40, the economics favor transitioning engineering resources from the cancelled 20A node to focus on 18A optimization. Partnerships with NVIDIA and SoftBank further underscore growing confidence in Intel’s foundry roadmap.
If Intel successfully attracts external customers and maintains yield improvements, 18A could mark the company’s return to process leadership after years trailing TSMC and Samsung.
FAQs
When will Intel 18A enter volume production?
Intel 18A is scheduled for volume manufacturing in late 2025 with Panther Lake CPUs.
What makes Intel 18A special?
It features RibbonFET GAA transistors and PowerVia backside power delivery, offering 25% better performance.