# Garuda Construction IPO Allotment Status: Check Application, GMP, and Listing Date

URL: https://technosports.co.in/garuda-construction-ipo-allotment-status/  
Published: 2024-10-12  
Updated: 2024-10-12  
Author: Raunak Saha

The much-anticipated **Garuda Construction [IPO](https://technosports.co.in/tag/ipo/)** is nearing its allotment phase, and investors are eager to check their application status. Based in Mumbai, **Garuda Construction** is offering shares in the price band of **Rs 92-95 per share**, with a lot size of **157 shares**. The company is expected to finalize the **share allotment** on **Friday, October 11**.

![Garuda Construction IPO Allotment Status: Check Application, GMP, and Listing Date](https://technosports.co.in/wp-content/uploads/2024/10/image-17-227.jpg)
*Garuda Construction IPO Allotment Status*

## Garuda Construction IPO Allotment Status: All Details Uncovered in 2024

### **Key Dates to Remember**

- **Bidding Period**: October 08 – October 10
- **Allotment Finalization**: Friday, October 11
- **Listing Date**: Tentatively set for **Tuesday, October 15**

Investors will receive notifications regarding their allotment status, debit of funds, or revocations of IPO mandates over the weekend or by **Monday, October 14** at the latest.

### **Garuda Construction IPO Overview**

Garuda Construction’s [IPO](https://technosports.co.in/tag/ipo/), which raised a total of **Rs 264.10 crore**, included a fresh issue of shares worth **Rs 173.85 crore** and an offer-for-sale (OFS) of up to **95 lakh equity shares**. Despite the company’s broad scope in providing construction services across residential, commercial, infrastructure, and industrial sectors, the IPO saw a **muted investor response**.

- **Total Subscription**: 7.55 times
- **Retail Investors’ Subscription**: 10.81 times
- **Non-Institutional Investors (NIIs) Subscription**: 9.03 times
- **Qualified Institutional Buyers (QIBs) Subscription**: 1.24 times

![Garuda Construction IPO Allotment Status: Check Application, GMP, and Listing Date](https://technosports.co.in/wp-content/uploads/2024/10/image-18-7-658x1024.jpg)
*Image via Livemint*

### **GMP and Investor Sentiment**

The **Grey Market Premium (GMP)** for Garuda Construction has seen a significant dip, reflecting the lukewarm response from investors. As of the latest reports, the stock is commanding **no premium** in the unofficial market, indicating minimal listing gains.

### **How to Check Garuda Construction IPO Allotment Status**

Investors who have applied for the **Garuda Construction IPO** can easily check their allotment status through two official platforms: **BSE** and **Link Intime India**, the [IPO](https://technosports.co.in/tag/ipo/) registrar.

![Garuda Construction IPO Allotment Status: Check Application, GMP, and Listing Date](https://technosports.co.in/wp-content/uploads/2024/10/image-17-229.jpg)

#### **Via BSE Website**:

1. Visit [BSE Allotment Status](https://www.bseindia.com/investors/appli_check.aspx)
2. Select “Equity” under the issue type.
3. Choose “Garuda Construction and Engineering Limited” from the dropdown menu.
4. Enter your **application number** and **PAN card** details.
5. Click on “I am not a robot” and hit the **Search** button.

#### **Via Link Intime India Website**:

1. Go to [Link Intime India](https://linkintime.co.in/MIPO/Ipoallotment.html).
2. Select **Garuda Construction and Engineering** in the [IPO](https://technosports.co.in/tag/ipo/) dropdown (if allotment is finalized).
3. Choose the method to check (Application number, Demat Account number, or PAN ID).
4. Select the application type: **ASBA** or **Non-ASBA**.
5. Enter the details, complete the captcha, and click **Submit**.

### **What’s Next?**

Garuda Construction’s shares are scheduled to be listed on **BSE** and **NSE** on **October 15, 2024**. Keep an eye on the **Link Intime India** website and BSE for the final allotment results.

![Garuda Construction IPO Allotment Status: Check Application, GMP, and Listing Date](https://technosports.co.in/wp-content/uploads/2024/10/image-17-230.jpg)

### **About Garuda Construction**

Founded in **2010**, **Garuda Construction** offers comprehensive construction services across various sectors, including residential, commercial, industrial, and infrastructure. Despite a **sluggish financial performance** and the cyclical nature of its business, brokerage firms have shown a **positive long-term outlook** on the company due to its strong order book and diversified portfolio.

This [IPO](https://technosports.co.in/tag/ipo/) marks another significant milestone for **Garuda Construction**, as it continues to expand its presence in the Indian construction industry.

Stay tuned for the latest updates on **Garuda Construction’s IPO** and make sure to check your allotment status using the steps outlined above!

## FAQs

### **1. What is the price band of the Garuda Construction IPO?**

The price band for the **Garuda Construction IPO** is set between **Rs 92-95 per share**.

### 2. What is the lot size for the Garuda Construction IPO?

The minimum lot size is **157 shares**, and investors can apply in multiples thereafter.

### 3. When will the Garuda Construction IPO allotment be finalized?

The allotment of shares is expected to be finalized on **Friday, October 11, 2024**.

### 4. How much did Garuda Construction raise from the IPO?

Garuda Construction raised a total of **Rs 264.10 crore**, which includes a fresh share issue worth **Rs 173.85 crore** and an offer-for-sale (OFS) of up to **95 lakh equity shares**.

### 5. What is the Garuda Construction IPO subscription status?

The IPO was **7.55 times oversubscribed** overall:  
**Retail investors**: 10.81 times  
**Non-institutional investors (NIIs)**: 9.03 times  
**Qualified Institutional Buyers (QIBs)**: 1.24 times

### 6. How do I check my Garuda Construction IPO allotment status?

You can check the allotment status through the **BSE** website or **Link Intime India**, the IPO registrar. Detailed steps for both methods are provided above in the blog post.

### 7. What is the Grey Market Premium (GMP) for the Garuda Construction IPO?

As of now, the **Grey Market Premium (GMP)** is currently showing **no premium**, indicating a negligible listing gain.
