TechnoSports Media Group
  • Home
  • Technology
  • Smartphones
  • Deal
  • Sports
  • Reviews
  • Gaming
  • Entertainment
No Result
View All Result
  • Home
  • Technology
  • Smartphones
  • Deal
  • Sports
  • Reviews
  • Gaming
  • Entertainment
No Result
View All Result
TechnoSports Media Group
No Result
View All Result

TSMC Gets $6.6B for Arizona Chip Plant, Opening in 2025

Ishika Setia by Ishika Setia
November 16, 2024
in FAQ, Technology
0

The Biden-Harris Administration has also approved $6.6 billion in funding to the Taiwan Semiconductor Manufacturing Company (TSMC) under the CHIPS and Science Act for three chip fabrication facilities in Arizona.

It comes after a smaller grant awarded in April, with the Department of Commerce verifying TSMC‘s compliance with CHIPS Act standards. These fabs will manufacture semiconductors across five advanced technologies, from 5nm through to 1.6nm (A16) process nodes.

RelatedPosts

Samsung Taylor Plant Starts: ASML Forms EUV Support Team

NVIDIA’s Made in USA: Impossible Without Taiwan Partners

AMD RDNA 5 GPUs: 12,000+ Cores Coming Late 2026

TSMC

Table of Contents

  • TSMC Secures $6.6 Billion Under CHIPS Act for Advanced Arizona Chip Plants, First Facility to Open in 2025
  • FAQs
    • When will TSMC’s Arizona facility start production?
    • What chip technologies will be produced in Arizona?

TSMC Secures $6.6 Billion Under CHIPS Act for Advanced Arizona Chip Plants, First Facility to Open in 2025

This funding also bolsters the U.S. semiconductor supply chain, filling a crucial national security gap created by outsourcing advanced chip production to other countries,” President Biden said. Expected to open by mid-2025, the initial facility will concentrate on 5-nanometer and 4-nanometer processes targeting GPUs and other high-performance chips. Arizona is controlled by TSMC Arizona, the firm’s US unit, which generally prevents stock buying from September 15 until expressly permitted to do so under the conditions of an agreement.

A logo of taiwanese chip giant TSMC is seen at southern Taiwan science park in Tainan, Taiwan December 29, 2022.REUTERS/Ann Wang/File Photo

Along with that $6.6 billion grant, TSMC Arizona will also get $5 billion in loans to fund the US$65 billion capital investment needed to set up the facilities, billed by President Biden as the largest foreign direct investment in a greenfield project in U.S. history. TSMC also expects its second facility to use TSMC’s cutting-edge 2-nanometer nanosheet process when it opens, and for 2-nanometer production at the third facility to start sometime later in the decade.

This is the first reference to 4nm or A16 process node being used for TSMC Arizona in today’s announcement. A16, part of TSMC’s sub-2-nanometer family, uses marketing terminology similar to Intel’s sub-2-nanometer technologies, measured in Angstroms rather than nanometers. TSMC plans to begin mass production of its 2-nanometer process in 2025, primarily in Taiwan, while Intel’s 18A process will be manufactured in the U.S.

Initially, TSMC’s advanced chips are expected to power devices like smartphones and laptops. Currently, TSMC’s 3-nanometer products are used by companies like Apple, while NVIDIA and AMD rely on its 4-nanometer and 5-nanometer technologies. Domestic production at the Arizona facilities should bolster the supply chain for U.S.-based chip designers, reducing reliance on the Asian manufacturing ecosystem.

FAQs

When will TSMC’s Arizona facility start production?

The first facility is set to begin production by mid-2025.

What chip technologies will be produced in Arizona?

The facilities will manufacture chips ranging from 5nm to 1.6nm (A16)

Tags: 3nmArizona Chip PlantTSMC
Previous Post

Microsoft Adds Tencent App Store to Windows 11 for Android Apps in China

Next Post

Stop WhatsApp Auto-Saving Media to iPhone Photos App

Related Posts

Technology

Samsung Taylor Plant Starts: ASML Forms EUV Support Team

November 5, 2025
Technology

NVIDIA’s Made in USA: Impossible Without Taiwan Partners

November 5, 2025
Technology

AMD RDNA 5 GPUs: 12,000+ Cores Coming Late 2026

November 5, 2025
Smart TV

Hisense Launches 116-Inch RGB TV, Smart Fridge & Washer

November 5, 2025
Apple

iOS 26.1 & macOS Tahoe 26.1: Tinted Liquid Glass Arrives

November 5, 2025
NAVI MUMBAI, INDIA - NOVEMBER 02: Laura Wolvaardt of South Africa celebrates her century during the ICC Women's Cricket World Cup India 2025 Final match between India and South Africa at Dr. DY Patil Sports Academy on November 02, 2025 in Navi Mumbai, India. (
Cricket

Laura Wolvaardt Overtakes Smriti Mandhana to Become World No. 1 ODI Batter After 571-Run World Cup

November 5, 2025
Next Post
Stop WhatsApp Auto-Saving Media to iPhone Photos App

Stop WhatsApp Auto-Saving Media to iPhone Photos App

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

TechnoSports Media Group

© 2025 TechnoSports Media Group - The Ultimate News Destination

Email: admin@technosports.co.in

  • Terms of Use
  • Privacy Policy
  • About Us
  • Contact Us

Follow Us

No Result
View All Result
  • Home
  • Technology
  • Smartphones
  • Deal
  • Sports
  • Reviews
  • Gaming
  • Entertainment

© 2025 TechnoSports Media Group - The Ultimate News Destination